Three walk-throughs. All of them labelled scenarios.
Chassira has no customer results yet, so this page does not pretend to. Each scenario describes a hypothetical line, what the agent would do at each autonomy level, and the metric table the pilot would fill in. When a design partner signs, the first real case study replaces the first scenario.
Illustrative scenario: Plant BIW-2 · EV crossover body shop to end of line · shift 1, one approval gate
Weld-defect and gap-and-flush vision on an EV crossover body shop
A hypothetical body-in-white line: 40-plus joining robots, servo-gun spot welding, laser seams on the roof, self-pierce rivets on the aluminium closures, structural adhesive, two framing stations with in-line metrology. Today joint quality is judged by sampled teardown and geometry by audit.
What the agent would do
- Shadow mode. Weld-and-Join scores every joint from current, force and expulsion traces and seam vision; Frame-and-Geometry reads in-line measurement and gap-and-flush images and predicts where variation is heading.
- Assist mode. Weld-and-Join proposes schedule and sequence changes ranked on the twin and the body-shop launch engineer approves each; Frame-and-Geometry proposes framing offsets.
- Bounded autonomy. framing offsets inside the qualified envelope execute automatically; every weld-schedule change stays with the engineer.
| Metric | How | Result |
|---|---|---|
| Weld rework per body | rework events by joint and station, before and during | to be measured |
| Expulsion events | per shift, by robot | to be measured |
| Bodies out of tolerance | per shift, by datum | to be measured |
| Gap-and-flush rework | per body at final | to be measured |
No result is claimed. The metric table is what the pilot would record.
Paint-defect detection and film-build control on a two-booth paint shop
A hypothetical paint shop: pretreat and e-coat, sealer, two colour booths, flash and cure ovens, a manual inspection deck. Today defects are found at the deck and fixed by spot repair or repaint, and the booth runs a fixed recipe per colour.
What the agent would do
- Shadow mode. Paint-and-Finish reads booth environment, film build and oven profiles per body and colour block and predicts the defect map; paint-defect vision on the deck localises what appears to zone and condition.
- Assist mode. Paint-and-Finish proposes booth humidity, airflow and flash adjustments ahead of each colour block; the paint engineer approves.
- Bounded autonomy. booth environment moves inside the qualified window; recipe and chemistry changes stay with the engineer.
| Metric | How | Result |
|---|---|---|
| Repaint rate | bodies repainted per shift, before and during | to be measured |
| Paint defects per body | by type: dirt, runs, orange peel, film build | to be measured |
| Film build in window | share of bodies, per colour | to be measured |
| Detection accuracy | vision against the inspection deck | to be measured |
No result is claimed. The metric table is what the pilot would record.
Torque and battery-joint conformance on a new battery-pack line
A hypothetical cell-to-pack line standing up for a new EV program: cell-to-pack joining, coolant and high-voltage integrity tests, torque-to-yield fastening at marriage. Today traces are recorded for traceability and faults are found at end of line or in the field.
What the agent would do
- Shadow mode. Powertrain-and-Battery scores every torque-to-yield trace against the specification curve and every joining and integrity signal per pack, and compares its calls with end-of-line results.
- Assist mode. the agent proposes holds and routing for units it predicts will fail; the process engineer decides. Torque specifications and joint parameters are never proposed for change.
- Bounded autonomy. holds and routing execute automatically inside agreed limits; everything about the specification stays human.
| Metric | How | Result |
|---|---|---|
| Faults caught before end of line | per shift, by fastener and joint | to be measured |
| Marriage rework | units per shift | to be measured |
| Escapes to end of line and field | per program, before and during | to be measured |
| Record completeness | share of packs with a full trace record | to be measured |
No result is claimed. The metric table is what the pilot would record.
The reference scenario, step by step
Every Chassira run is an ordered, inspectable sequence. This is run_41a9c2 on Plant BIW-2 · EV crossover body shop to end of line · shift 1. Scenario completes in 10 steps with one approval gate. Weld schedule change on robot W-14 approved by the body-shop launch engineer, framing offset held inside the envelope, booth humidity trimmed before the predicted dirt defects appeared, one pack held at marriage on a torque trace, and the shift released with full as-built records.
-
01
ingest.shift
SUCCEEDED
0.8 s
Plant Orchestrator · Pulled the shift build sequence, program control plan and qualified envelopes from MES: 412 bodies, four trim variants, weld schedule set W-rev 7, framing targets per station, paint colour blocks, torque specifications. Locked every safety-critical parameter as read-only.
-
02
twin.simulate
SUCCEEDED
1 m 40 s
Vehicle-and-Line Twin · Simulated 18 candidate weld-sequence, framing-offset and booth-window combinations on the plant twin, ranked on predicted body geometry, expulsion risk at robot W-14, paint defect map and takt against launch cadence.
-
03
stamp.form
SUCCEEDED
continuous
Stamp-and-Form · Blank feed on press line P-3 adjusted by 0.4 mm and lubricant dose raised 3 percent for the new coil lot as springback risk on the rear door inner climbed. Panel dimension held inside the window; genealogy handed to framing.
-
04
approve.human
APPROVAL
3 m 12 s
Plant Orchestrator · Candidate #6 lowers weld current 2 percent and adds 20 ms hold on robot W-14 to cut predicted expulsion. Weld schedules are crash-safety critical and stay with a human, so the change was held for the body-shop launch engineer and approved at 06:14:52.
-
05
weld.join
SUCCEEDED
continuous
Weld-and-Join · Approved schedule 7b applied on W-14. Current and force traces confirmed inside the window on the first 40 bodies; predicted expulsion risk fell from 0.31 to 0.06 and no geometry debt was introduced at the adjacent seams.
-
06
frame.geometry
SUCCEEDED
continuous
Frame-and-Geometry · Framing station FS-1 offset corrected by 0.3 mm on the left B-pillar datum inside the qualified envelope as in-line measurement trended toward the tolerance edge. Gap-and-flush vision confirmed the correction on the next 25 bodies.
-
07
paint.finish
SUCCEEDED
continuous
Paint-and-Finish · Booth B-2 humidity trimmed 2 points and airflow rebalanced for the dark-colour block as the defect model predicted dirt on horizontal panels. Film build held inside the window on the first colour block.
-
08
marriage.torque
SUCCEEDED
continuous
Powertrain-and-Battery · Pack PK-1182 held at marriage after a torque-to-yield trace on fastener 7 fell outside the specification curve. Routed to rework with the trace attached; torque specification untouched, as always.
-
09
inspect.fuse
SUCCEEDED
continuous
Quality-and-Anomaly · Gap-and-flush and paint-defect cameras, weld and torque traces and test results fused per body. Two paint dirt defects localised to booth B-2 zone 3 before the humidity trim took effect; both routed to spot repair, none escaped to final.
-
10
eol.release
SUCCEEDED
2 m 05 s
EOL-and-Calibrate · End of line proved alignment, ADAS calibration, leak, brake, roll and functional tests on every vehicle; two ADAS retests sequenced inside takt. Shift 1 released with as-built records, approvals and dispositions written for the quality lead.
The agent shows its work
Every tool invocation, argument and result is written to an append-only, human-readable log, and every reasoning step is expandable. Nothing about a run is hidden from the plant.
- 06:00:02mes.read_sequence({ plant: "BIW-2", shift: 1, program: "EV-CUV" })
- 06:00:03ok 412 bodies · 4 variants · weld set W-rev 7 · torque specs read-only
- 06:00:04twin.simulate({ candidates: 18, horizon: "1 shift" })
- 06:01:44ok best #6 · geometry inside targets · expulsion risk 0.06 · takt 61 s
- 06:01:45policy.evaluate({ candidate: 6, autonomy: "L2+" })
- 06:01:45ok 6 writes permitted · weld_schedule requires human approval · torque_spec locked
- 06:01:46blank.set_feed({ press: "P-3", delta: "+0.4 mm", lube: "+3%" })
- 06:02:30ok springback risk 0.42 → 0.11 · panel dimension in window
- 06:02:31approval.request({ action: "weld_schedule", robot: "W-14", current: "-2%", hold: "+20 ms" })
- 06:14:52ok approved by body-shop launch engineer · logged
- 06:14:53weld.apply_schedule({ robot: "W-14", rev: "7b" })
- 06:48:10ok 40 bodies in window · expulsion risk 0.31 → 0.06
- 06:48:11frame.set_offset({ station: "FS-1", datum: "B-pillar L", delta: "-0.3 mm" })
- 07:12:44ok 25 bodies inside targets · gap-and-flush confirmed
- 07:12:45booth.set_env({ booth: "B-2", humidity: "-2 pt", airflow: "rebalance" })
- 07:40:02precursor: dirt risk 0.58 · booth B-2 zone 3 · dark colour block
- 07:40:03ok 2 defects localised · routed to spot repair · 0 escaped
- 08:05:19unit.hold({ pack: "PK-1182", fastener: 7, reason: "torque trace off curve" })
- 08:05:19ok held at marriage · routed to rework · spec untouched
- 08:05:20sensors.fuse({ cams: 24, traces: true, tests: true })
- 13:40:00retest.sequence({ vehicles: 2, test: "ADAS calibration" })
- 13:52:31ok 2 retests passed inside takt
- 13:58:00mes.log_vehicle({ shift: 1, records: "as-built" })
- 14:00:05ok scenario complete · 10 steps · 0 escapes · shift released
Reasoning trace
Plan, thought, action, observation, exactly as the orchestrator would record it.
GoalRun shift 1 on plant BIW-2 inside the qualified envelopes, hol…
Run shift 1 on plant BIW-2 inside the qualified envelopes, hold body geometry at the framing station, keep expulsion and paint defects from escaping, hold every torque to specification and prove every vehicle at end of line.
PlanSimulate weld-sequence, framing and booth candidates on the tw…
Simulate weld-sequence, framing and booth candidates on the twin first. Lead with stamping so panels arrive in dimension, then propose the weld schedule and hold it for a human, then correct framing inside the envelope, then set the booth ahead of the colour block. Fuse inspection continuously. Never touch a torque specification or a test verdict.
ThoughtThe standing weld schedule on W-14 runs current high enough to…
The standing weld schedule on W-14 runs current high enough to guarantee the joint on the thickest stack. With the new coil lot and panel dimension held at P-3, the twin predicts the same joint quality at 2 percent lower current with a 20 ms hold, and lower expulsion, because the panels arrive flatter.
Actiontwin.simulate(candidates=18) returns #6: blank feed +0.4 mm on…
twin.simulate(candidates=18) returns #6: blank feed +0.4 mm on P-3, weld current -2 percent and +20 ms hold on W-14, framing offset -0.3 mm at FS-1, booth B-2 humidity -2 points for the dark block.
ObservationCandidate #6 predicts geometry inside targets, expulsion risk …
Candidate #6 predicts geometry inside targets, expulsion risk 0.06, a lower dirt map and takt at 61 seconds. Three candidates scored better on takt but pushed predicted B-pillar variation past the tolerance edge and were discarded.
ActionExecute #6: six bounded writes permitted on stamping, framing,…
Execute #6: six bounded writes permitted on stamping, framing, booth, routing and sequencing; the weld-schedule write routed to the body-shop launch engineer; torque specifications and test limits locked.
ObservationDirt precursor in booth B-2 zone 3 at 07:40:02 before the humi…
Dirt precursor in booth B-2 zone 3 at 07:40:02 before the humidity trim took effect. Two defects localised and routed to spot repair; none escaped. One pack held at marriage on a torque trace at 08:05:19.
OutcomeScenario complete. Geometry inside targets, no expulsion escap…
Scenario complete. Geometry inside targets, no expulsion escapes, paint defects caught in station, one pack reworked, two ADAS retests passed inside takt. Shift 1 released with full as-built records.
Four levels, set per agent and per tag
A car plant does not go from manual to unattended in one step. Chassira makes the level explicit, auditable and reversible at any time. The first release runs shadow mode, then assist mode, then bounded autonomy on low-risk loops. Weld schedules stay supervised until the joint family is qualified, and torque specifications and test verdicts are never written by an agent.
| Level | What the agent does | What the human does | Where it sits in a pilot |
|---|---|---|---|
| L1 · Shadow | Reads weld, metrology, vision, torque, test, robot and MES signals; predicts and recommends; writes nothing | Runs the line as today; compares predictions to audit and engineer outcomes | Design partners start here; the baseline is measured from the plant's own records |
| L2 · Assist | Proposes weld, framing, paint, routing, holding and sequencing moves with evidence, confidence, envelope and rollback path | Approves each action in the review console | Assist mode: accuracy and ROI proven against the signed baseline |
| L3 · Bounded | Executes pre-approved low-risk actions: booth environment, framing offsets, blank feed and lubrication, routing, holds, sequencing, inside PLC and safety limits and the qualified envelope | Approves weld-schedule changes, torque-related decisions and vehicle release | Graduated autonomy, after audited accuracy and ROI |
| L4 · Scaled | Supervised weld-schedule adaptation for qualified joint families, across lines and plants | Sets the envelope; reviews the shift record and evaluation results | Planned; after golden-dataset evaluation, twin validation and quality sign-off. Torque specifications and test verdicts never leave human hands |
Straight answers
The questions plant managers, launch engineers and quality leads ask in the first meeting.
Yes, but only within an explicit tag allow-list with per-tag rate and magnitude limits, inside the qualified envelope, and only at the autonomy level your plant has set. Design partners start in shadow mode, where Chassira writes nothing. Weld-schedule changes wait for a named body-shop engineer, and torque specifications, battery-joint parameters and end-of-line test limits and verdicts are read-only to every agent, always.
Control returns to the press, robot, booth or MES controller's last known-good state. Chassira is a supervisory layer on top of the safety-rated PLCs and interlocks you already run, never a replacement for them, so an outage degrades the line to its current way of running, not to a stop.
Advisory recommendations start from the plant twin and the control plan in the first weeks. Weld, geometry, paint, torque and end-of-line prediction improve as line history and labelled outcomes accumulate per program. The compute plan sizes onboarding at 150 to 600 GPU-hours per plant and 50,000 to 250,000 synthetic variants per program, all design targets.
Only if you choose cloud training. Designs, control plans, specs, process models and quality records are isolated per tenant and never used to train another OEM's models. On-prem and plant-edge deployment are available for regulated plants, and federated cross-plant learning is planned and waits on data-rights agreements.
You are, the same as with any control strategy, which is why every write is policy-checked, bounded, logged and reversible, and why anything crash-safety or IATF relevant waits for a named approver. The audit log records the request, the evidence, the envelope applied and the human decision.
A paid pilot on one process or area at the Process tier, scoped to a single wedge with a success metric written into the order form: weld or geometry rework, downtime minutes, paint defect or repaint rate, warranty or PPM, or launch quality. Shadow mode first, then assist mode with your engineer approving each move, then bounded autonomy on low-risk loops once ROI and safety gates are met.
Make the first scenario real
Start with one process and one measurable baseline. A paid pilot on body-shop weld and gap-and-flush vision, paint-defect detection and film-build control, or torque and battery-joint conformance shows the number before you commit further.