Pricing

Priced per process. Justified per vehicle.

Process, Plant and Enterprise. The Process tier covers one control or inspection module on one production process or area. Plant covers the whole plant. Enterprise is for multi-plant OEM and platform fleets. Annual prepay carries a 15 to 20% discount and outcome components are available on rework, downtime, warranty and first-time-through.

Process · $18,000 per process / monthPlant · $140,000 / monthEnterprise · $1M to $15M ACV

Packaging logic

Land, expand, monetise the value

  1. Land. Low-friction entry on one process with a clear ROI metric, on the Process tier.
  2. Expand. Processes, plants, OEM sites and autonomy level, into Plant and Enterprise.
  3. Monetise value. Usage and outcome pricing on rework, downtime, warranty and first-time-through capture upside as the agent does more of the work.

Floor pricing is protected. Discounts are traded for term length and a reference; EV and flagship-program references are the ones we value most.

Pricing

Priced per process, per plant, per fleet

Land on one process with a measured baseline. Expand by process, plant and autonomy level. Outcome components are available on rework, downtime, warranty and first-time-through. Annual prepay carries a 15 to 20% discount.

Billing period
Process $18,000 per production process or area / month · billed monthly

Weld, paint or assembly control, or defect-inspection AI, for one process. For plants validating ROI on the wedge.

  • One process or area, one agent module
  • Plant-edge inference node included
  • Controller and sensor reads, guarded writes
  • Run log, audit trail, as-built record
  • Business-hours support
Start a pilot
Enterprise Custom land $1M to $15M ACV

Multi-plant OEM and platform fleets standardising on Chassira, with custom weld, paint, geometry and battery models.

  • Multi-plant fleet management
  • Custom weld, paint, geometry and battery models
  • Plant edge fleet with on-prem option
  • Group autonomy policy and approval chains
  • SLAs, SSO and RBAC, dedicated engineer
Contact us
Compare

What is in each tier

Areas are licensed per process on the Process tier and bundled on Plant and Enterprise.

What is in each tier
CapabilityProcessPlantEnterprise
Processes covered1All on siteAll in fleet
Agent modules1 of 10 areasAll agentsAll agents + custom models
Vehicle-and-line twinNoIncludedCustom program twins
Plant-edge nodeIncludedPer processFleet managed
Guarded controller writesScoped tagsAll scoped tagsGroup policy
As-built recordIncludedIncludedIncluded + IATF and APQP packets
Autonomy levelsL1 to L2L1 to L3L1 to L4 when qualified
SSO and RBACNoPlannedPlanned, with approval chains
On-prem deploymentNoOptionalIncluded
SupportBusiness hours24/724/7 + named engineer
Indicative price$18,000/mo$140,000/mo$1M to $15M ACV
ROI

The arithmetic a plant runs

We do not publish savings percentages because we have not measured any yet. These are the inputs a plant brings to the pilot baseline, and the outputs the pilot measures.

Inputs you already have

  • Weld and geometry rework per body, with the station and joint behind each
  • Repaint rate and paint defects per body by type
  • Torque, fill, battery-joint and ADAS faults caught at end of line and escaping to the field
  • Downtime minutes per shift and the andon causes behind them
  • First-time-through and PPM by station
  • Launch-ramp quality and takt against the program plan

What the pilot measures

  • Weld, geometry, paint, torque, battery and ADAS prediction accuracy against the vision and audit baseline on the wedge workflow
  • Rework reduction and downtime-minute reduction
  • First-time-through and warranty improvement
  • Launch-quality and PPM improvement
  • A hard ROI metric tied to the Process price
  • Conversion of the design partner to paid
Run timeline · scenario

What you are actually buying

A run engine that produces this record on every vehicle, every shift, on every process you license.

run_41a9c2 Plant BIW-2 · EV crossover body shop to end of line · shift 1 illustrative scenario SUCCEEDED
  1. 01 ingest.shift SUCCEEDED 0.8 s

    Plant Orchestrator · Pulled the shift build sequence, program control plan and qualified envelopes from MES: 412 bodies, four trim variants, weld schedule set W-rev 7, framing targets per station, paint colour blocks, torque specifications. Locked every safety-critical parameter as read-only.

  2. 02 twin.simulate SUCCEEDED 1 m 40 s

    Vehicle-and-Line Twin · Simulated 18 candidate weld-sequence, framing-offset and booth-window combinations on the plant twin, ranked on predicted body geometry, expulsion risk at robot W-14, paint defect map and takt against launch cadence.

  3. 03 stamp.form SUCCEEDED continuous

    Stamp-and-Form · Blank feed on press line P-3 adjusted by 0.4 mm and lubricant dose raised 3 percent for the new coil lot as springback risk on the rear door inner climbed. Panel dimension held inside the window; genealogy handed to framing.

  4. 04 approve.human APPROVAL 3 m 12 s

    Plant Orchestrator · Candidate #6 lowers weld current 2 percent and adds 20 ms hold on robot W-14 to cut predicted expulsion. Weld schedules are crash-safety critical and stay with a human, so the change was held for the body-shop launch engineer and approved at 06:14:52.

  5. 05 weld.join SUCCEEDED continuous

    Weld-and-Join · Approved schedule 7b applied on W-14. Current and force traces confirmed inside the window on the first 40 bodies; predicted expulsion risk fell from 0.31 to 0.06 and no geometry debt was introduced at the adjacent seams.

  6. 06 frame.geometry SUCCEEDED continuous

    Frame-and-Geometry · Framing station FS-1 offset corrected by 0.3 mm on the left B-pillar datum inside the qualified envelope as in-line measurement trended toward the tolerance edge. Gap-and-flush vision confirmed the correction on the next 25 bodies.

  7. 07 paint.finish SUCCEEDED continuous

    Paint-and-Finish · Booth B-2 humidity trimmed 2 points and airflow rebalanced for the dark-colour block as the defect model predicted dirt on horizontal panels. Film build held inside the window on the first colour block.

  8. 08 marriage.torque SUCCEEDED continuous

    Powertrain-and-Battery · Pack PK-1182 held at marriage after a torque-to-yield trace on fastener 7 fell outside the specification curve. Routed to rework with the trace attached; torque specification untouched, as always.

  9. 09 inspect.fuse SUCCEEDED continuous

    Quality-and-Anomaly · Gap-and-flush and paint-defect cameras, weld and torque traces and test results fused per body. Two paint dirt defects localised to booth B-2 zone 3 before the humidity trim took effect; both routed to spot repair, none escaped to final.

  10. 10 eol.release SUCCEEDED 2 m 05 s

    EOL-and-Calibrate · End of line proved alignment, ADAS calibration, leak, brake, roll and functional tests on every vehicle; two ADAS retests sequenced inside takt. Shift 1 released with as-built records, approvals and dispositions written for the quality lead.

Segments

Which plan fits

Passenger-car OEM plants, light-truck plants, EV plants and startups, and tier-1 body, battery and module suppliers. Most plants pick one process and one wedge, prove the number, then expand.

Passenger-car OEM plantsLaunch cadence, first-time-through

Passenger-car OEM plants

Body, paint and general-assembly lines launching new models every year. The body-shop wedge first: weld-defect and gap-and-flush vision where rework is already counted.

Light-truck plantsMixed-material bodies, high takt

Light-truck plants

Aluminium and mixed-material joining, large panels and long general-assembly lines. Weld-and-Join and Frame-and-Geometry on the line with the most geometry rework.

EV plants and startupsNew battery lines, thin staffing

EV plants and startups

Cell-to-pack and cell-to-body lines standing up faster than engineers can staff them. Powertrain-and-Battery conformance on the marriage line first.

Tier-1 body, battery and module suppliersSupplier PPM, IATF traceability

Tier-1 body, battery and module suppliers

Body structures, battery modules and subassemblies delivered under IATF 16949 and customer PPM targets. Quality-and-Anomaly and conformance on the line that ships to the OEM.

Guardrails

An agent near a crash-safety joint needs a leash

Chassira writes to production equipment. Every capability is scoped, every write is policy-checked against the qualified envelope, safety-critical parameters are locked, and every action is written to an append-only audit log the plant owns.

  • Bounded action space. Each agent writes only to an explicit tag allow-list, inside per-tag rate and magnitude limits and the qualified process envelope for the joint family, colour block or vehicle program.
  • Policy engine before every write. Autonomy level, shift, program, interlock state and operator presence are evaluated before a setpoint moves. NeMo Guardrails enforces spec, IATF, functional-safety, cyber and human-approval policy before any action writes back to robots, MES, QA or work instructions.
  • Safety-critical parameters locked. Weld schedules wait for a named body-shop engineer until the joint family is qualified. Torque specifications, battery-joint parameters and end-of-line test limits and verdicts are read-only to every agent, always.
  • Immutable audit log. Append-only and exportable. Every action records source evidence, the approved envelope, confidence, estimated quality, rework, downtime and warranty impact, rollback path, approver and vehicle scope.
  • Hard fallback. Loss of the edge node, the network or a model returns control to the press, robot, booth or MES controller's last known-good state. Safety-rated PLCs and interlocks are never in Chassira's path.
  • Tenant and program isolation. Vehicle designs, control plans, specs, models and memory never cross an OEM boundary. On-prem and plant-edge deployment are available for regulated plants.

Compliance posture

Compliance and certification status
ItemScopeStatus
SOC 2 Type ICloud control plane QUEUED Planned, first 6 months, with an IATF and functional-safety-aware review
SOC 2 Type IICloud control plane QUEUED Planned, 6 to 12 months
SSO and RBACConsole and approvals QUEUED Planned, 6 to 12 months
IATF 16949 and APQP assurance packagesDisposition and traceability evidence QUEUED Planned, 6 to 12 months; not a certification claim
ISO 26262-aware controlFunctional-safety requirements cited in reasoning and gates RUNNING In the design; not a certification claim
Standards-cited reasoningIATF 16949, APQP and PPAP, torque specs, recall procedures RUNNING In the design, every answer cites its source
Per-tenant and program isolationDesigns, control plans, models, memory RUNNING In the design from day one
On-prem and plant-edge deploymentRegulated OEM plants RUNNING Design option

Read the security overview

Enterprise

Standardise autonomy across the fleet

One policy model, one audit trail, one benchmark across every process in every plant, with the weld, paint, geometry and battery models kept private to each plant and program.

Talk to us Enterprise details

  • SSO and role-based access down to the tag level, planned for the 6 to 12 month release
  • Fleet-wide autonomy policy with per-plant override and approval chains
  • Cross-plant benchmarking on first-time-through, rework, repaint, downtime and warranty
  • On-prem and plant-edge deployment for regulated OEM plants
  • Edge autonomy that survives control-plane loss by returning to the controller's last known-good state
  • Dedicated deployment engineer and quarterly model review per plant
FAQ

Straight answers

The questions plant managers, launch engineers and quality leads ask in the first meeting.

Yes, but only within an explicit tag allow-list with per-tag rate and magnitude limits, inside the qualified envelope, and only at the autonomy level your plant has set. Design partners start in shadow mode, where Chassira writes nothing. Weld-schedule changes wait for a named body-shop engineer, and torque specifications, battery-joint parameters and end-of-line test limits and verdicts are read-only to every agent, always.

Get started

Start with one process

Start with one process and one measurable baseline. A paid pilot on body-shop weld and gap-and-flush vision, paint-defect detection and film-build control, or torque and battery-joint conformance shows the number before you commit further.