Body-in-white
The welded, unpainted body structure before paint and assembly. Hundreds of spot welds, laser seams, rivets and adhesive beads to crash-safety geometry.
A glossary of the terms Chassira's agents work with, the standards the reasoning layer cites, and the inputs a plant brings to a pilot baseline. No white papers or calculators are published yet; this page is the reference we actually have.
Retrieval is tenant-isolated and every answer carries its citation. Citing a standard is not a certification claim.
The process and quality terms that appear throughout the site.
The welded, unpainted body structure before paint and assembly. Hundreds of spot welds, laser seams, rivets and adhesive beads to crash-safety geometry.
The gaps between adjacent panels and how flush their surfaces sit. Measured at framing and final; the customer's first judgement of build quality.
The body-shop station where panels and subassemblies are fixtured and joined into a dimensionally complete body. Where millimetre geometry is decided.
Molten metal ejected from a spot weld under too much current or too little force. A sign of a weak joint and a cause of surface damage.
A stamped panel's elastic return after forming, which moves it off the die geometry. Predicted from material, die and press state.
The thickness of a paint layer. Too thin fails corrosion and durability; too thick runs and sags. Controlled through flash, cure and application.
A paint surface texture like citrus skin, from poor flow-out. A booth environment and application defect.
A fastening strategy that tightens a bolt into its yield region for a consistent clamp load. Judged from the full trace, not the final torque.
The station where body and chassis, or body and battery pack, are joined. A safety-critical, torque-controlled operation.
The time between two vehicles leaving a station or the line. A car plant launches a vehicle roughly every 60 seconds.
Just-in-sequence and just-in-time feeding of parts to the line in build order. Sequence-and-Flow optimises both.
The share of vehicles that pass every station and test without rework. The plant manager's headline quality number.
Advanced product quality planning and production part approval, the automotive quality framework the reasoning layer cites.
The record of a vehicle: welds, measurements, paint readings, torque traces, test results, approvals, rework and disposition, written per vehicle.
The inputs for a baseline agreed in writing.
The pages that explain the mechanics.
How the plant-edge runtime, orchestrator, agents, twin and cloud loop fit together.
The write path, locked parameters, the audit record and the data governance.
What a pilot on the body shop, the paint shop or a pack line would do and measure.
A car every sixty seconds, autonomy as a dial, hit build quality before the shift.
The SDK and CLI design previews.
Tiers, the comparison table and the arithmetic a plant runs.
Every Chassira run is an ordered, inspectable sequence. This is run_41a9c2 on Plant BIW-2 · EV crossover body shop to end of line · shift 1. Scenario completes in 10 steps with one approval gate. Weld schedule change on robot W-14 approved by the body-shop launch engineer, framing offset held inside the envelope, booth humidity trimmed before the predicted dirt defects appeared, one pack held at marriage on a torque trace, and the shift released with full as-built records.
Plant Orchestrator · Pulled the shift build sequence, program control plan and qualified envelopes from MES: 412 bodies, four trim variants, weld schedule set W-rev 7, framing targets per station, paint colour blocks, torque specifications. Locked every safety-critical parameter as read-only.
Vehicle-and-Line Twin · Simulated 18 candidate weld-sequence, framing-offset and booth-window combinations on the plant twin, ranked on predicted body geometry, expulsion risk at robot W-14, paint defect map and takt against launch cadence.
Stamp-and-Form · Blank feed on press line P-3 adjusted by 0.4 mm and lubricant dose raised 3 percent for the new coil lot as springback risk on the rear door inner climbed. Panel dimension held inside the window; genealogy handed to framing.
Plant Orchestrator · Candidate #6 lowers weld current 2 percent and adds 20 ms hold on robot W-14 to cut predicted expulsion. Weld schedules are crash-safety critical and stay with a human, so the change was held for the body-shop launch engineer and approved at 06:14:52.
Weld-and-Join · Approved schedule 7b applied on W-14. Current and force traces confirmed inside the window on the first 40 bodies; predicted expulsion risk fell from 0.31 to 0.06 and no geometry debt was introduced at the adjacent seams.
Frame-and-Geometry · Framing station FS-1 offset corrected by 0.3 mm on the left B-pillar datum inside the qualified envelope as in-line measurement trended toward the tolerance edge. Gap-and-flush vision confirmed the correction on the next 25 bodies.
Paint-and-Finish · Booth B-2 humidity trimmed 2 points and airflow rebalanced for the dark-colour block as the defect model predicted dirt on horizontal panels. Film build held inside the window on the first colour block.
Powertrain-and-Battery · Pack PK-1182 held at marriage after a torque-to-yield trace on fastener 7 fell outside the specification curve. Routed to rework with the trace attached; torque specification untouched, as always.
Quality-and-Anomaly · Gap-and-flush and paint-defect cameras, weld and torque traces and test results fused per body. Two paint dirt defects localised to booth B-2 zone 3 before the humidity trim took effect; both routed to spot repair, none escaped to final.
EOL-and-Calibrate · End of line proved alignment, ADAS calibration, leak, brake, roll and functional tests on every vehicle; two ADAS retests sequenced inside takt. Shift 1 released with as-built records, approvals and dispositions written for the quality lead.
A car plant does not go from manual to unattended in one step. Chassira makes the level explicit, auditable and reversible at any time. The first release runs shadow mode, then assist mode, then bounded autonomy on low-risk loops. Weld schedules stay supervised until the joint family is qualified, and torque specifications and test verdicts are never written by an agent.
| Level | What the agent does | What the human does | Where it sits in a pilot |
|---|---|---|---|
| L1 · Shadow | Reads weld, metrology, vision, torque, test, robot and MES signals; predicts and recommends; writes nothing | Runs the line as today; compares predictions to audit and engineer outcomes | Design partners start here; the baseline is measured from the plant's own records |
| L2 · Assist | Proposes weld, framing, paint, routing, holding and sequencing moves with evidence, confidence, envelope and rollback path | Approves each action in the review console | Assist mode: accuracy and ROI proven against the signed baseline |
| L3 · Bounded | Executes pre-approved low-risk actions: booth environment, framing offsets, blank feed and lubrication, routing, holds, sequencing, inside PLC and safety limits and the qualified envelope | Approves weld-schedule changes, torque-related decisions and vehicle release | Graduated autonomy, after audited accuracy and ROI |
| L4 · Scaled | Supervised weld-schedule adaptation for qualified joint families, across lines and plants | Sets the envelope; reviews the shift record and evaluation results | Planned; after golden-dataset evaluation, twin validation and quality sign-off. Torque specifications and test verdicts never leave human hands |
A spot weld lasts a fraction of a second and a body passes a station every minute. Perception has to be local, deterministic and fast, so Chassira runs GPU inference at the plant edge and keeps training, simulation and optimisation in the cloud or on-prem.
8 to 32 cameras per process area at 15 to 60 FPS, plus torque, dimensional, thermal, robot and paint-instrument streams fused at the cell. Weld and gap alerts under 50 ms and paint or dimensional prompts under 150 ms are the design targets. Jetson Thor is planned for higher density.
Weld-defect, geometry-risk, paint-risk, torque and battery, and takt-risk models served at the plant edge with versioned rollback, routed by latency, tenant and cost, with canary rollout by line.
Weld, paint and gap vision, dimensional models, NeMo IATF and spec reasoning and GPU-accelerated stamping, springback and weld-geometry FEA surrogates. 150 to 600 GPU-hours per plant during onboarding, then monthly retraining from engineer corrections. Dedicated capacity is planned.
Body framing, weld sequence, robot reach, paint flow and line balance simulated before the shift. The pattern is production proven at BMW and Mercedes-Benz, per the architecture; Chassira's twin and OVX capacity are planned.
Rare weld defects, paint failures, geometry-drift modes, occluded joints and misbuild cases generated and validated against real distributions before promotion. 50,000 to 250,000 variants per program is the design target. Planned.
Line sequencing and JIS feeding, AGV routing, takt, line balancing, buffers and retest sequencing.
Robotic weld, paint, assembly and inspection cells and AGV and AMR line-feed autonomy, with skills validated in simulation before a cell runs them.
Telemetry ETL across weld and press parameters, measurements, paint readings, torque traces, battery and ADAS results, non-conformance and takt history for retraining and benchmarks.
Spec, IATF, functional-safety, cyber and human-approval policy enforced before any write; supportable on-prem or plant-edge deployment for regulated OEM plants.
The questions plant managers, launch engineers and quality leads ask in the first meeting.
Yes, but only within an explicit tag allow-list with per-tag rate and magnitude limits, inside the qualified envelope, and only at the autonomy level your plant has set. Design partners start in shadow mode, where Chassira writes nothing. Weld-schedule changes wait for a named body-shop engineer, and torque specifications, battery-joint parameters and end-of-line test limits and verdicts are read-only to every agent, always.
Control returns to the press, robot, booth or MES controller's last known-good state. Chassira is a supervisory layer on top of the safety-rated PLCs and interlocks you already run, never a replacement for them, so an outage degrades the line to its current way of running, not to a stop.
Advisory recommendations start from the plant twin and the control plan in the first weeks. Weld, geometry, paint, torque and end-of-line prediction improve as line history and labelled outcomes accumulate per program. The compute plan sizes onboarding at 150 to 600 GPU-hours per plant and 50,000 to 250,000 synthetic variants per program, all design targets.
Only if you choose cloud training. Designs, control plans, specs, process models and quality records are isolated per tenant and never used to train another OEM's models. On-prem and plant-edge deployment are available for regulated plants, and federated cross-plant learning is planned and waits on data-rights agreements.
You are, the same as with any control strategy, which is why every write is policy-checked, bounded, logged and reversible, and why anything crash-safety or IATF relevant waits for a named approver. The audit log records the request, the evidence, the envelope applied and the human decision.
A paid pilot on one process or area at the Process tier, scoped to a single wedge with a success metric written into the order form: weld or geometry rework, downtime minutes, paint defect or repaint rate, warranty or PPM, or launch quality. Shadow mode first, then assist mode with your engineer approving each move, then bounded autonomy on low-risk loops once ROI and safety gates are met.
Start with one process and one measurable baseline. A paid pilot on body-shop weld and gap-and-flush vision, paint-defect detection and film-build control, or torque and battery-joint conformance shows the number before you commit further.