Customers

Who we build for, and who we are looking for first.

Chassira is pre-launch. We have no customers to name and will not borrow logos. This page says who the product is for, what a design partner commits to, and who we deliberately do not target.

Pre-launch2 to 4 design-partner plantsPaid pilot on one process

Ideal customer

Vehicle manufacturers and their major assembly suppliers

Passenger-car and light-truck OEM plants, EV plants and startups, and tier-1 body, battery and module suppliers running stamping, body-in-white welding and joining, framing, paint, powertrain and battery, general assembly and end-of-line test, with $500M to $100B+ of operating scope.

body shoppaintbatteryassemblyend of line
Qualification

What makes a good first plant

The criteria we check, in order.

We look for

  • Enough volume and downtime cost to drive a clear ROI; rework, downtime minutes, warranty and recall risk are major costs and crash-safety risk is high
  • Existing robot cells, presses, paint systems, vision and metrology, torque and fastening systems and MES with API or OT access for integration
  • An executive mandate to raise first-time-through and launch quality or cut rework, downtime and warranty, and to automate production across plants
  • Willingness to run a paid pilot with a defined rework, downtime, warranty or first-time-through success metric

We do not target

  • Low-volume specialty makers and coachbuilders with no robotic or instrumented production scope
  • Plants unwilling to integrate robot, press, paint, vision, torque and MES systems under IP and security controls
  • Buyers seeking a generic horizontal dashboard rather than a system of action
Design partner programme

What the first cohort gets and gives

Two to four plants with one high-value process each, that agree to baseline rework, downtime, warranty and first-time-through from their own records before anything is written.

  1. Shadow mode. We connect read-only to the wedge workflow, observe and measure the baseline from your own records. Nothing is written.
  2. Assist mode. The agent recommends weld, paint, torque-related or routing moves and predicts defects, geometry and warranty risk. Your engineer approves each one. Accuracy and ROI are measured against the signed baseline.
  3. Graduated autonomy. Pre-approved low-risk weld, paint and torque-adjacent loops run inside limits with exceptions escalated, if the plant is satisfied with the recommendations. Weld schedules stay supervised; torque specifications and test verdicts stay human.
  4. Expansion. The pilot converts to the Process tier and expands process by process, then plant by plant across the OEM. Design partners get written access terms for telemetry and quality outcomes, and a say in the roadmap.
Who it is for

Built for the people who run the plant

We have no customer quotes to show yet and will not invent any. These are the three roles in a car plant we build for, and the problems they bring to the first meeting.

Plant Manager or Manufacturing Director

Owns launch dates, takt, downtime, first-time-through, rework and cost.

What this person is dealing with today

  • Sampled inspection, andon reaction and siloed cell PLCs that let joint quality, geometry, paint and torque drift
  • Launch ramps where quality and takt collapse under new-model, EV and mixed-material complexity
  • A skilled process-engineer and technician shortage that cannot staff the localisation and EV launch wave

Body, Paint or Assembly Process (Launch) Engineer

Owns weld, paint and torque process windows, framing geometry, dimensional accuracy and launch quality.

What this person is dealing with today

  • Weld, rivet and adhesive parameter and sequence drift driving crash-safety joint defects, geometry loss and rework
  • Body-in-white dimensional and gap-and-flush error at framing costing downtime and warranty per body
  • Paint dirt, runs, orange peel and e-coat and film-build faults driving repaint, scrap and corrosion warranty

Quality, STA or Conformance Lead

Owns build quality, PPM, warranty and recall exposure, and IATF 16949, APQP and functional-safety traceability.

What this person is dealing with today

  • Torque, fluid-fill, battery-joint and ADAS-calibration faults escaping to the field as warranty and recall exposure
  • Stamping, body, paint, powertrain, battery, assembly and end of line siloed and reactive across the plant
  • Traceability evidence assembled by hand after the fact
Segments

Where plants start

Passenger-car OEM plants, light-truck plants, EV plants and startups, and tier-1 body, battery and module suppliers. Most plants pick one process and one wedge, prove the number, then expand.

Passenger-car OEM plantsLaunch cadence, first-time-through

Passenger-car OEM plants

Body, paint and general-assembly lines launching new models every year. The body-shop wedge first: weld-defect and gap-and-flush vision where rework is already counted.

Light-truck plantsMixed-material bodies, high takt

Light-truck plants

Aluminium and mixed-material joining, large panels and long general-assembly lines. Weld-and-Join and Frame-and-Geometry on the line with the most geometry rework.

EV plants and startupsNew battery lines, thin staffing

EV plants and startups

Cell-to-pack and cell-to-body lines standing up faster than engineers can staff them. Powertrain-and-Battery conformance on the marriage line first.

Tier-1 body, battery and module suppliersSupplier PPM, IATF traceability

Tier-1 body, battery and module suppliers

Body structures, battery modules and subassemblies delivered under IATF 16949 and customer PPM targets. Quality-and-Anomaly and conformance on the line that ships to the OEM.

Run timeline · scenario

One scenario shift, step by step

Every Chassira run is an ordered, inspectable sequence. This is run_41a9c2 on Plant BIW-2 · EV crossover body shop to end of line · shift 1. Scenario completes in 10 steps with one approval gate. Weld schedule change on robot W-14 approved by the body-shop launch engineer, framing offset held inside the envelope, booth humidity trimmed before the predicted dirt defects appeared, one pack held at marriage on a torque trace, and the shift released with full as-built records.

run_41a9c2 Plant BIW-2 · EV crossover body shop to end of line · shift 1 illustrative scenario SUCCEEDED
  1. 01 ingest.shift SUCCEEDED 0.8 s

    Plant Orchestrator · Pulled the shift build sequence, program control plan and qualified envelopes from MES: 412 bodies, four trim variants, weld schedule set W-rev 7, framing targets per station, paint colour blocks, torque specifications. Locked every safety-critical parameter as read-only.

  2. 02 twin.simulate SUCCEEDED 1 m 40 s

    Vehicle-and-Line Twin · Simulated 18 candidate weld-sequence, framing-offset and booth-window combinations on the plant twin, ranked on predicted body geometry, expulsion risk at robot W-14, paint defect map and takt against launch cadence.

  3. 03 stamp.form SUCCEEDED continuous

    Stamp-and-Form · Blank feed on press line P-3 adjusted by 0.4 mm and lubricant dose raised 3 percent for the new coil lot as springback risk on the rear door inner climbed. Panel dimension held inside the window; genealogy handed to framing.

  4. 04 approve.human APPROVAL 3 m 12 s

    Plant Orchestrator · Candidate #6 lowers weld current 2 percent and adds 20 ms hold on robot W-14 to cut predicted expulsion. Weld schedules are crash-safety critical and stay with a human, so the change was held for the body-shop launch engineer and approved at 06:14:52.

  5. 05 weld.join SUCCEEDED continuous

    Weld-and-Join · Approved schedule 7b applied on W-14. Current and force traces confirmed inside the window on the first 40 bodies; predicted expulsion risk fell from 0.31 to 0.06 and no geometry debt was introduced at the adjacent seams.

  6. 06 frame.geometry SUCCEEDED continuous

    Frame-and-Geometry · Framing station FS-1 offset corrected by 0.3 mm on the left B-pillar datum inside the qualified envelope as in-line measurement trended toward the tolerance edge. Gap-and-flush vision confirmed the correction on the next 25 bodies.

  7. 07 paint.finish SUCCEEDED continuous

    Paint-and-Finish · Booth B-2 humidity trimmed 2 points and airflow rebalanced for the dark-colour block as the defect model predicted dirt on horizontal panels. Film build held inside the window on the first colour block.

  8. 08 marriage.torque SUCCEEDED continuous

    Powertrain-and-Battery · Pack PK-1182 held at marriage after a torque-to-yield trace on fastener 7 fell outside the specification curve. Routed to rework with the trace attached; torque specification untouched, as always.

  9. 09 inspect.fuse SUCCEEDED continuous

    Quality-and-Anomaly · Gap-and-flush and paint-defect cameras, weld and torque traces and test results fused per body. Two paint dirt defects localised to booth B-2 zone 3 before the humidity trim took effect; both routed to spot repair, none escaped to final.

  10. 10 eol.release SUCCEEDED 2 m 05 s

    EOL-and-Calibrate · End of line proved alignment, ADAS calibration, leak, brake, roll and functional tests on every vehicle; two ADAS retests sequenced inside takt. Shift 1 released with as-built records, approvals and dispositions written for the quality lead.

Autonomy

Four levels, set per agent and per tag

A car plant does not go from manual to unattended in one step. Chassira makes the level explicit, auditable and reversible at any time. The first release runs shadow mode, then assist mode, then bounded autonomy on low-risk loops. Weld schedules stay supervised until the joint family is qualified, and torque specifications and test verdicts are never written by an agent.

Autonomy levels and the human role at each
LevelWhat the agent doesWhat the human doesWhere it sits in a pilot
L1 · ShadowReads weld, metrology, vision, torque, test, robot and MES signals; predicts and recommends; writes nothingRuns the line as today; compares predictions to audit and engineer outcomesDesign partners start here; the baseline is measured from the plant's own records
L2 · AssistProposes weld, framing, paint, routing, holding and sequencing moves with evidence, confidence, envelope and rollback pathApproves each action in the review consoleAssist mode: accuracy and ROI proven against the signed baseline
L3 · BoundedExecutes pre-approved low-risk actions: booth environment, framing offsets, blank feed and lubrication, routing, holds, sequencing, inside PLC and safety limits and the qualified envelopeApproves weld-schedule changes, torque-related decisions and vehicle releaseGraduated autonomy, after audited accuracy and ROI
L4 · ScaledSupervised weld-schedule adaptation for qualified joint families, across lines and plantsSets the envelope; reviews the shift record and evaluation resultsPlanned; after golden-dataset evaluation, twin validation and quality sign-off. Torque specifications and test verdicts never leave human hands
FAQ

Straight answers

The questions plant managers, launch engineers and quality leads ask in the first meeting.

Yes, but only within an explicit tag allow-list with per-tag rate and magnitude limits, inside the qualified envelope, and only at the autonomy level your plant has set. Design partners start in shadow mode, where Chassira writes nothing. Weld-schedule changes wait for a named body-shop engineer, and torque specifications, battery-joint parameters and end-of-line test limits and verdicts are read-only to every agent, always.

Get started

Apply as a design partner

Tell us the process, the metric and the baseline you would sign. We will tell you honestly whether the wedge fits.