Weld lines and framing stations
Score every joint, catch expulsion and geometry debt as they form, propose the schedule for the engineer and correct framing inside the envelope. Metric: weld and geometry rework per body against the baseline.
Every car plant already measures rework per body, repaint rate, faults escaping to end of line, first-time-through and downtime minutes. Chassira lands on one of those numbers, on one process, with a baseline agreed in writing, and expands when it moves.
Illustrative scenario: Plant BIW-2 · EV crossover body shop to end of line · shift 1, one approval gate
The first paid pilot targets one of these. The metric column is what the pilot would be judged on.
Score every joint, catch expulsion and geometry debt as they form, propose the schedule for the engineer and correct framing inside the envelope. Metric: weld and geometry rework per body against the baseline.
Predict the defect map and set the booth ahead of it; localise what still appears to zone and condition. Metric: repaint rate and paint defects per body by type against the baseline.
Score every torque-to-yield trace and joining signal, hold the unit before a fault leaves the station, never touch the specification. Metric: faults caught before end of line and marriage rework.
Predict mis-torque, under-fill and glazing faults per vehicle and route or hold before end of line. Metric: torque and fill rework per vehicle and faults escaping to end of line.
Predict failures from the upstream build record and sequence retests inside takt; never write a verdict. Metric: first-time-through rate and retests per shift.
Rehearse the shift on the twin, optimise sequence, feeding and buffers against launch cadence, hold geometry and quality through the ramp. Metric: launch-ramp quality and takt adherence against the program plan.
Chassira is not a dashboard. Each agent closes a loop a plant already measures in rework per body, repaint rate, faults escaping to end of line and downtime minutes. The tables show what each loop watches and what it is allowed to move.
Servo-gun traces, seam vision and in-line measurement are fused at the cell into one estimate of joint quality and body geometry. Weld-and-Join proposes the schedule and sequence that hold crash-safety quality without geometry debt, the body-shop engineer approves, and Frame-and-Geometry corrects the framing station inside its envelope.
| Signal | Watches | Moves |
|---|---|---|
| Weld current and force | Servo-gun trace per joint | Schedule proposal, under approval |
| Expulsion | Trace and seam vision | Current and hold, under approval |
| Body dimension | In-line measurement | Framing offset inside the envelope |
Booth temperature, humidity and airflow, film build and oven profiles are read per body and colour block. Paint-and-Finish predicts the defect map a body will carry and trims the booth inside the qualified window ahead of it; paint-defect vision localises what still appears to zone and condition.
| Signal | Watches | Moves |
|---|---|---|
| Booth environment | Temperature, humidity, airflow sensors | Setpoints inside the window |
| Film build | Film-build gauges | Flash and cure profile |
| Dirt, runs, orange peel | Paint-defect vision | Zone routing, spot-repair request |
Torque-to-yield traces, cell-to-pack joining signals, fill volumes and glazing vision are scored per fastener and per vehicle. Powertrain-and-Battery and Trim-and-Fasten hold and route units before a fault reaches end of line. Torque specifications and joint parameters are never written by an agent.
| Signal | Watches | Moves |
|---|---|---|
| Torque to yield | Tool trace per fastener | Unit hold and routing |
| Pack integrity | Joining, coolant and HV tests | Hold, proposal to engineer |
| Fluid fill | Volume and pressure | Fill setpoints inside the window |
End-of-line results are fused with the upstream build record to predict failures before the stand sees them, and retests are sequenced inside takt. Sequence-and-Flow prices every sequence and buffer move in minutes and rework and optimises feeding and routing with cuOpt against launch cadence.
| Signal | Watches | Moves |
|---|---|---|
| ADAS calibration | Test-stand result | Retest sequencing |
| Alignment, leak, brake, roll | Test-stand results | Rework routing |
| Takt and buffers | MES, AGV and AMR state | Sequence and buffer targets |
Passenger-car OEM plants, light-truck plants, EV plants and startups, and tier-1 body, battery and module suppliers. Most plants pick one process and one wedge, prove the number, then expand.
Body, paint and general-assembly lines launching new models every year. The body-shop wedge first: weld-defect and gap-and-flush vision where rework is already counted.
Aluminium and mixed-material joining, large panels and long general-assembly lines. Weld-and-Join and Frame-and-Geometry on the line with the most geometry rework.
Cell-to-pack and cell-to-body lines standing up faster than engineers can staff them. Powertrain-and-Battery conformance on the marriage line first.
Body structures, battery modules and subassemblies delivered under IATF 16949 and customer PPM targets. Quality-and-Anomaly and conformance on the line that ships to the OEM.
Every Chassira run is an ordered, inspectable sequence. This is run_41a9c2 on Plant BIW-2 · EV crossover body shop to end of line · shift 1. Scenario completes in 10 steps with one approval gate. Weld schedule change on robot W-14 approved by the body-shop launch engineer, framing offset held inside the envelope, booth humidity trimmed before the predicted dirt defects appeared, one pack held at marriage on a torque trace, and the shift released with full as-built records.
Plant Orchestrator · Pulled the shift build sequence, program control plan and qualified envelopes from MES: 412 bodies, four trim variants, weld schedule set W-rev 7, framing targets per station, paint colour blocks, torque specifications. Locked every safety-critical parameter as read-only.
Vehicle-and-Line Twin · Simulated 18 candidate weld-sequence, framing-offset and booth-window combinations on the plant twin, ranked on predicted body geometry, expulsion risk at robot W-14, paint defect map and takt against launch cadence.
Stamp-and-Form · Blank feed on press line P-3 adjusted by 0.4 mm and lubricant dose raised 3 percent for the new coil lot as springback risk on the rear door inner climbed. Panel dimension held inside the window; genealogy handed to framing.
Plant Orchestrator · Candidate #6 lowers weld current 2 percent and adds 20 ms hold on robot W-14 to cut predicted expulsion. Weld schedules are crash-safety critical and stay with a human, so the change was held for the body-shop launch engineer and approved at 06:14:52.
Weld-and-Join · Approved schedule 7b applied on W-14. Current and force traces confirmed inside the window on the first 40 bodies; predicted expulsion risk fell from 0.31 to 0.06 and no geometry debt was introduced at the adjacent seams.
Frame-and-Geometry · Framing station FS-1 offset corrected by 0.3 mm on the left B-pillar datum inside the qualified envelope as in-line measurement trended toward the tolerance edge. Gap-and-flush vision confirmed the correction on the next 25 bodies.
Paint-and-Finish · Booth B-2 humidity trimmed 2 points and airflow rebalanced for the dark-colour block as the defect model predicted dirt on horizontal panels. Film build held inside the window on the first colour block.
Powertrain-and-Battery · Pack PK-1182 held at marriage after a torque-to-yield trace on fastener 7 fell outside the specification curve. Routed to rework with the trace attached; torque specification untouched, as always.
Quality-and-Anomaly · Gap-and-flush and paint-defect cameras, weld and torque traces and test results fused per body. Two paint dirt defects localised to booth B-2 zone 3 before the humidity trim took effect; both routed to spot repair, none escaped to final.
EOL-and-Calibrate · End of line proved alignment, ADAS calibration, leak, brake, roll and functional tests on every vehicle; two ADAS retests sequenced inside takt. Shift 1 released with as-built records, approvals and dispositions written for the quality lead.
We have no customer quotes to show yet and will not invent any. These are the three roles in a car plant we build for, and the problems they bring to the first meeting.
What this person is dealing with today
What this person is dealing with today
What this person is dealing with today
A car plant does not go from manual to unattended in one step. Chassira makes the level explicit, auditable and reversible at any time. The first release runs shadow mode, then assist mode, then bounded autonomy on low-risk loops. Weld schedules stay supervised until the joint family is qualified, and torque specifications and test verdicts are never written by an agent.
| Level | What the agent does | What the human does | Where it sits in a pilot |
|---|---|---|---|
| L1 · Shadow | Reads weld, metrology, vision, torque, test, robot and MES signals; predicts and recommends; writes nothing | Runs the line as today; compares predictions to audit and engineer outcomes | Design partners start here; the baseline is measured from the plant's own records |
| L2 · Assist | Proposes weld, framing, paint, routing, holding and sequencing moves with evidence, confidence, envelope and rollback path | Approves each action in the review console | Assist mode: accuracy and ROI proven against the signed baseline |
| L3 · Bounded | Executes pre-approved low-risk actions: booth environment, framing offsets, blank feed and lubrication, routing, holds, sequencing, inside PLC and safety limits and the qualified envelope | Approves weld-schedule changes, torque-related decisions and vehicle release | Graduated autonomy, after audited accuracy and ROI |
| L4 · Scaled | Supervised weld-schedule adaptation for qualified joint families, across lines and plants | Sets the envelope; reviews the shift record and evaluation results | Planned; after golden-dataset evaluation, twin validation and quality sign-off. Torque specifications and test verdicts never leave human hands |
Land on one process with a measured baseline. Expand by process, plant and autonomy level. Outcome components are available on rework, downtime, warranty and first-time-through. Annual prepay carries a 15 to 20% discount.
Weld, paint or assembly control, or defect-inspection AI, for one process. For plants validating ROI on the wedge.
The whole plant: stamp and form, weld and join, frame and geometry, paint and finish, powertrain and battery, trim and fasten, end of line and calibrate, quality and anomaly, sequence and flow, and the twin.
Multi-plant OEM and platform fleets standardising on Chassira, with custom weld, paint, geometry and battery models.
The questions plant managers, launch engineers and quality leads ask in the first meeting.
Yes, but only within an explicit tag allow-list with per-tag rate and magnitude limits, inside the qualified envelope, and only at the autonomy level your plant has set. Design partners start in shadow mode, where Chassira writes nothing. Weld-schedule changes wait for a named body-shop engineer, and torque specifications, battery-joint parameters and end-of-line test limits and verdicts are read-only to every agent, always.
Control returns to the press, robot, booth or MES controller's last known-good state. Chassira is a supervisory layer on top of the safety-rated PLCs and interlocks you already run, never a replacement for them, so an outage degrades the line to its current way of running, not to a stop.
Advisory recommendations start from the plant twin and the control plan in the first weeks. Weld, geometry, paint, torque and end-of-line prediction improve as line history and labelled outcomes accumulate per program. The compute plan sizes onboarding at 150 to 600 GPU-hours per plant and 50,000 to 250,000 synthetic variants per program, all design targets.
Only if you choose cloud training. Designs, control plans, specs, process models and quality records are isolated per tenant and never used to train another OEM's models. On-prem and plant-edge deployment are available for regulated plants, and federated cross-plant learning is planned and waits on data-rights agreements.
You are, the same as with any control strategy, which is why every write is policy-checked, bounded, logged and reversible, and why anything crash-safety or IATF relevant waits for a named approver. The audit log records the request, the evidence, the envelope applied and the human decision.
A paid pilot on one process or area at the Process tier, scoped to a single wedge with a success metric written into the order form: weld or geometry rework, downtime minutes, paint defect or repaint rate, warranty or PPM, or launch quality. Shadow mode first, then assist mode with your engineer approving each move, then bounded autonomy on low-risk loops once ROI and safety gates are met.
Start with one process and one measurable baseline. A paid pilot on body-shop weld and gap-and-flush vision, paint-defect detection and film-build control, or torque and battery-joint conformance shows the number before you commit further.
↑↓ navigate↵ openesc close