Partners

The channel is the machinery.

Chassira's distribution plan runs through the companies already on the plant floor: robot OEMs, press and paint vendors, metrology and vision vendors, torque and test-stand vendors, MES providers and the integrators who connect them. The programme opens with the design-partner cohort; nothing here is a signed partnership.

Robots · paint · metrology · MESProgramme plannedNo signed partners claimed

run_41a9c2 · agent graph · plant BIW-2 · scenario 10 nodes · 1 approval gate
01 · orchestrator ingest.shift ✓ SUCCEEDED 02 · vehicle_line twin.simulate ✓ SUCCEEDED 03 · stamp_form stamp.form ✓ SUCCEEDED 04 · orchestrator approve.human ◆ APPROVAL 05 · weld_join weld.join ✓ SUCCEEDED 06 · frame_geometry frame.geometry ✓ SUCCEEDED 07 · paint_finish paint.finish ✓ SUCCEEDED 08 · powertrain_battery marriage.torque ✓ SUCCEEDED 09 · quality_anomaly inspect.fuse ✓ SUCCEEDED 10 · eol_calibrate eol.release ✓ SUCCEEDED

Illustrative scenario: Plant BIW-2 · EV crossover body shop to end of line · shift 1, one approval gate

Partner types

Who fits, and how

How each kind of partner fits the plan.

Robot OEMs and line integrators

Weld, paint and assembly cells

Cells shipped Chassira-ready, with controller tags, limits and envelopes declared at the factory. The agent runs on the OEM cell; the OEM keeps the robot relationship.

Press and paint-system vendors

Press lines, booths, ovens

Press telemetry and booth environment exposed through declared connectors. The vendor keeps the equipment; Chassira adds the prediction and the bounded loop.

Metrology and vision vendors

In-line dimensional, gap-and-flush, paint inspection

Station data fused into Quality-and-Anomaly and Frame-and-Geometry. The vendor keeps the measurement; Chassira adds the prediction and the root cause.

Torque and test-stand vendors

Fastening traceability, battery and end-of-line test

Traces and results read into the as-built record; specifications and verdicts stay with the vendor's system and the plant.

MES and twin vendors

Sequencing, control plans, plant twins

As-built records written back into the system of record, and plant-twin models exchanged with the Vehicle-and-Line Twin.

Vehicle manufacturers

Design partners

The first two to four plants shape the roadmap and get written access terms. See the customers page.

How it works

What a partner does and gets

The outline of the programme as planned.

A partner does

  • Declares the tags, limits, envelopes and interfaces on the systems they ship or support
  • Co-delivers the shadow-mode and assist-mode weeks of a pilot
  • Brings a plant with a metric and a signed baseline

A partner gets

  • A Chassira-ready designation for the cell, station or MES, once the connector is proven
  • A share of the Process and Plant subscription on plants they bring
  • Early access to the SDK and the twin for their own engineering
Integrations

It speaks plant, not cloud

Chassira reads and writes through the systems already on the floor. No rip and replace, no parallel historian, no new HMI to learn. Vendor names are examples of systems found in car plants, not certified integrations; connector availability is confirmed per site.

Robot cells

Robot and cell controllers (KUKA, FANUC, ABB, Yaskawa, Comau class systems)

Cell state, traces and paths; guarded writes inside interlocks

Presses and dies

Press lines and die protection (Schuler, AIDA class systems)

Force, stroke and feed reads; guarded feed and lube writes

Welding and joining

Servo-gun, laser, rivet and adhesive controllers (Bosch Rexroth, FANUC servo-gun class systems)

Trace reads; schedule writes under engineer approval

Paint systems

Booths, ovens and paint robots (Dürr EcoPaint class systems)

Environment and profile reads; guarded booth writes

Vision and metrology

In-line vision and dimensional systems (Cognex, Keyence, ISRA Vision, Hexagon, Zeiss, Perceptron class systems)

Images, point clouds and measurements per body

Torque and fastening

Torque tools and traceability (Atlas Copco, Bosch Rexroth, Desoutter class systems)

Traces per fastener; specifications read-only

Battery and EOL test

Pack, ADAS and end-of-line test systems (AVL, Dürr, Burke Porter class systems)

Results per unit; verdicts and limits read-only

MES, andon and sequencing

Plant MES and twin platforms (Siemens Opcenter and Tecnomatix, Dassault DELMIA, Rockwell Plex, AVEVA, in-house OEM systems)

Sequence, control plans, as-built records; sequence writes inside limits

See all integrations

Run timeline · scenario

One scenario shift, step by step

Every Chassira run is an ordered, inspectable sequence. This is run_41a9c2 on Plant BIW-2 · EV crossover body shop to end of line · shift 1. Scenario completes in 10 steps with one approval gate. Weld schedule change on robot W-14 approved by the body-shop launch engineer, framing offset held inside the envelope, booth humidity trimmed before the predicted dirt defects appeared, one pack held at marriage on a torque trace, and the shift released with full as-built records.

run_41a9c2 Plant BIW-2 · EV crossover body shop to end of line · shift 1 illustrative scenario SUCCEEDED
  1. 01 ingest.shift SUCCEEDED 0.8 s

    Plant Orchestrator · Pulled the shift build sequence, program control plan and qualified envelopes from MES: 412 bodies, four trim variants, weld schedule set W-rev 7, framing targets per station, paint colour blocks, torque specifications. Locked every safety-critical parameter as read-only.

  2. 02 twin.simulate SUCCEEDED 1 m 40 s

    Vehicle-and-Line Twin · Simulated 18 candidate weld-sequence, framing-offset and booth-window combinations on the plant twin, ranked on predicted body geometry, expulsion risk at robot W-14, paint defect map and takt against launch cadence.

  3. 03 stamp.form SUCCEEDED continuous

    Stamp-and-Form · Blank feed on press line P-3 adjusted by 0.4 mm and lubricant dose raised 3 percent for the new coil lot as springback risk on the rear door inner climbed. Panel dimension held inside the window; genealogy handed to framing.

  4. 04 approve.human APPROVAL 3 m 12 s

    Plant Orchestrator · Candidate #6 lowers weld current 2 percent and adds 20 ms hold on robot W-14 to cut predicted expulsion. Weld schedules are crash-safety critical and stay with a human, so the change was held for the body-shop launch engineer and approved at 06:14:52.

  5. 05 weld.join SUCCEEDED continuous

    Weld-and-Join · Approved schedule 7b applied on W-14. Current and force traces confirmed inside the window on the first 40 bodies; predicted expulsion risk fell from 0.31 to 0.06 and no geometry debt was introduced at the adjacent seams.

  6. 06 frame.geometry SUCCEEDED continuous

    Frame-and-Geometry · Framing station FS-1 offset corrected by 0.3 mm on the left B-pillar datum inside the qualified envelope as in-line measurement trended toward the tolerance edge. Gap-and-flush vision confirmed the correction on the next 25 bodies.

  7. 07 paint.finish SUCCEEDED continuous

    Paint-and-Finish · Booth B-2 humidity trimmed 2 points and airflow rebalanced for the dark-colour block as the defect model predicted dirt on horizontal panels. Film build held inside the window on the first colour block.

  8. 08 marriage.torque SUCCEEDED continuous

    Powertrain-and-Battery · Pack PK-1182 held at marriage after a torque-to-yield trace on fastener 7 fell outside the specification curve. Routed to rework with the trace attached; torque specification untouched, as always.

  9. 09 inspect.fuse SUCCEEDED continuous

    Quality-and-Anomaly · Gap-and-flush and paint-defect cameras, weld and torque traces and test results fused per body. Two paint dirt defects localised to booth B-2 zone 3 before the humidity trim took effect; both routed to spot repair, none escaped to final.

  10. 10 eol.release SUCCEEDED 2 m 05 s

    EOL-and-Calibrate · End of line proved alignment, ADAS calibration, leak, brake, roll and functional tests on every vehicle; two ADAS retests sequenced inside takt. Shift 1 released with as-built records, approvals and dispositions written for the quality lead.

Accelerated computing

Physical AI, at the line

A spot weld lasts a fraction of a second and a body passes a station every minute. Perception has to be local, deterministic and fast, so Chassira runs GPU inference at the plant edge and keeps training, simulation and optimisation in the cloud or on-prem.

Jetson Orin · DeepStream · Holoscan · TensorRT

Edge perception

8 to 32 cameras per process area at 15 to 60 FPS, plus torque, dimensional, thermal, robot and paint-instrument streams fused at the cell. Weld and gap alerts under 50 ms and paint or dimensional prompts under 150 ms are the design targets. Jetson Thor is planned for higher density.

Triton · NIM

Model serving

Weld-defect, geometry-risk, paint-risk, torque and battery, and takt-risk models served at the plant edge with versioned rollback, routed by latency, tenant and cost, with canary rollout by line.

DGX or HGX · NeMo

Training

Weld, paint and gap vision, dimensional models, NeMo IATF and spec reasoning and GPU-accelerated stamping, springback and weld-geometry FEA surrogates. 150 to 600 GPU-hours per plant during onboarding, then monthly retraining from engineer corrections. Dedicated capacity is planned.

Omniverse · OVX

Plant twin

Body framing, weld sequence, robot reach, paint flow and line balance simulated before the shift. The pattern is production proven at BMW and Mercedes-Benz, per the architecture; Chassira's twin and OVX capacity are planned.

Cosmos · Omniverse Replicator

Synthetic data

Rare weld defects, paint failures, geometry-drift modes, occluded joints and misbuild cases generated and validated against real distributions before promotion. 50,000 to 250,000 variants per program is the design target. Planned.

cuOpt

Optimisation

Line sequencing and JIS feeding, AGV routing, takt, line balancing, buffers and retest sequencing.

Isaac · Isaac ROS

Robot cells and AMRs

Robotic weld, paint, assembly and inspection cells and AGV and AMR line-feed autonomy, with skills validated in simulation before a cell runs them.

RAPIDS

GPU ETL

Telemetry ETL across weld and press parameters, measurements, paint readings, torque traces, battery and ADAS results, non-conformance and takt history for retraining and benchmarks.

NeMo Guardrails · NVIDIA AI Enterprise

Policy and deployment

Spec, IATF, functional-safety, cyber and human-approval policy enforced before any write; supportable on-prem or plant-edge deployment for regulated OEM plants.

FAQ

Straight answers

The questions plant managers, launch engineers and quality leads ask in the first meeting.

Yes, but only within an explicit tag allow-list with per-tag rate and magnitude limits, inside the qualified envelope, and only at the autonomy level your plant has set. Design partners start in shadow mode, where Chassira writes nothing. Weld-schedule changes wait for a named body-shop engineer, and torque specifications, battery-joint parameters and end-of-line test limits and verdicts are read-only to every agent, always.

Get started

Talk about partnering

Tell us what you ship or support and which plants run it.