Run a wedge on one process
Body-shop vision, paint-defect and film-build control, or torque and battery-joint conformance, with a metric you already measure.
Chassira starts with a paid pilot on one process and a baseline agreed in writing. Tell us the process, the metric and the systems on it. We will say plainly whether the wedge fits and what shadow mode, assist mode and graduated autonomy would look like on your line.
Body-shop vision, paint-defect and film-build control, or torque and battery-joint conformance, with a metric you already measure.
Robot OEMs, press and paint vendors, metrology and vision, torque and test stands, MES providers, integrators.
We answer plainly, including what is planned rather than done.
Edge perception, OT integration, simulation, vehicle-assembly process engineering.
On the body shop, the paint shop, torque, end of line and autonomy in the car plant.
Pre-revenue, pre-institutional. We do not claim traction we do not have.
The first-release plan, applied to your process.
Every Chassira run is an ordered, inspectable sequence. This is run_41a9c2 on Plant BIW-2 · EV crossover body shop to end of line · shift 1. Scenario completes in 10 steps with one approval gate. Weld schedule change on robot W-14 approved by the body-shop launch engineer, framing offset held inside the envelope, booth humidity trimmed before the predicted dirt defects appeared, one pack held at marriage on a torque trace, and the shift released with full as-built records.
Plant Orchestrator · Pulled the shift build sequence, program control plan and qualified envelopes from MES: 412 bodies, four trim variants, weld schedule set W-rev 7, framing targets per station, paint colour blocks, torque specifications. Locked every safety-critical parameter as read-only.
Vehicle-and-Line Twin · Simulated 18 candidate weld-sequence, framing-offset and booth-window combinations on the plant twin, ranked on predicted body geometry, expulsion risk at robot W-14, paint defect map and takt against launch cadence.
Stamp-and-Form · Blank feed on press line P-3 adjusted by 0.4 mm and lubricant dose raised 3 percent for the new coil lot as springback risk on the rear door inner climbed. Panel dimension held inside the window; genealogy handed to framing.
Plant Orchestrator · Candidate #6 lowers weld current 2 percent and adds 20 ms hold on robot W-14 to cut predicted expulsion. Weld schedules are crash-safety critical and stay with a human, so the change was held for the body-shop launch engineer and approved at 06:14:52.
Weld-and-Join · Approved schedule 7b applied on W-14. Current and force traces confirmed inside the window on the first 40 bodies; predicted expulsion risk fell from 0.31 to 0.06 and no geometry debt was introduced at the adjacent seams.
Frame-and-Geometry · Framing station FS-1 offset corrected by 0.3 mm on the left B-pillar datum inside the qualified envelope as in-line measurement trended toward the tolerance edge. Gap-and-flush vision confirmed the correction on the next 25 bodies.
Paint-and-Finish · Booth B-2 humidity trimmed 2 points and airflow rebalanced for the dark-colour block as the defect model predicted dirt on horizontal panels. Film build held inside the window on the first colour block.
Powertrain-and-Battery · Pack PK-1182 held at marriage after a torque-to-yield trace on fastener 7 fell outside the specification curve. Routed to rework with the trace attached; torque specification untouched, as always.
Quality-and-Anomaly · Gap-and-flush and paint-defect cameras, weld and torque traces and test results fused per body. Two paint dirt defects localised to booth B-2 zone 3 before the humidity trim took effect; both routed to spot repair, none escaped to final.
EOL-and-Calibrate · End of line proved alignment, ADAS calibration, leak, brake, roll and functional tests on every vehicle; two ADAS retests sequenced inside takt. Shift 1 released with as-built records, approvals and dispositions written for the quality lead.
Land on one process with a measured baseline. Expand by process, plant and autonomy level. Outcome components are available on rework, downtime, warranty and first-time-through. Annual prepay carries a 15 to 20% discount.
Weld, paint or assembly control, or defect-inspection AI, for one process. For plants validating ROI on the wedge.
The whole plant: stamp and form, weld and join, frame and geometry, paint and finish, powertrain and battery, trim and fasten, end of line and calibrate, quality and anomaly, sequence and flow, and the twin.
Multi-plant OEM and platform fleets standardising on Chassira, with custom weld, paint, geometry and battery models.
Chassira writes to production equipment. Every capability is scoped, every write is policy-checked against the qualified envelope, safety-critical parameters are locked, and every action is written to an append-only audit log the plant owns.
| Item | Scope | Status |
|---|---|---|
| SOC 2 Type I | Cloud control plane | QUEUED Planned, first 6 months, with an IATF and functional-safety-aware review |
| SOC 2 Type II | Cloud control plane | QUEUED Planned, 6 to 12 months |
| SSO and RBAC | Console and approvals | QUEUED Planned, 6 to 12 months |
| IATF 16949 and APQP assurance packages | Disposition and traceability evidence | QUEUED Planned, 6 to 12 months; not a certification claim |
| ISO 26262-aware control | Functional-safety requirements cited in reasoning and gates | RUNNING In the design; not a certification claim |
| Standards-cited reasoning | IATF 16949, APQP and PPAP, torque specs, recall procedures | RUNNING In the design, every answer cites its source |
| Per-tenant and program isolation | Designs, control plans, models, memory | RUNNING In the design from day one |
| On-prem and plant-edge deployment | Regulated OEM plants | RUNNING Design option |
Chassira reads and writes through the systems already on the floor. No rip and replace, no parallel historian, no new HMI to learn. Vendor names are examples of systems found in car plants, not certified integrations; connector availability is confirmed per site.
Robot and cell controllers (KUKA, FANUC, ABB, Yaskawa, Comau class systems)
Cell state, traces and paths; guarded writes inside interlocks
Press lines and die protection (Schuler, AIDA class systems)
Force, stroke and feed reads; guarded feed and lube writes
Servo-gun, laser, rivet and adhesive controllers (Bosch Rexroth, FANUC servo-gun class systems)
Trace reads; schedule writes under engineer approval
Booths, ovens and paint robots (Dürr EcoPaint class systems)
Environment and profile reads; guarded booth writes
In-line vision and dimensional systems (Cognex, Keyence, ISRA Vision, Hexagon, Zeiss, Perceptron class systems)
Images, point clouds and measurements per body
Torque tools and traceability (Atlas Copco, Bosch Rexroth, Desoutter class systems)
Traces per fastener; specifications read-only
Pack, ADAS and end-of-line test systems (AVL, Dürr, Burke Porter class systems)
Results per unit; verdicts and limits read-only
Plant MES and twin platforms (Siemens Opcenter and Tecnomatix, Dassault DELMIA, Rockwell Plex, AVEVA, in-house OEM systems)
Sequence, control plans, as-built records; sequence writes inside limits
The questions plant managers, launch engineers and quality leads ask in the first meeting.
Yes, but only within an explicit tag allow-list with per-tag rate and magnitude limits, inside the qualified envelope, and only at the autonomy level your plant has set. Design partners start in shadow mode, where Chassira writes nothing. Weld-schedule changes wait for a named body-shop engineer, and torque specifications, battery-joint parameters and end-of-line test limits and verdicts are read-only to every agent, always.
Control returns to the press, robot, booth or MES controller's last known-good state. Chassira is a supervisory layer on top of the safety-rated PLCs and interlocks you already run, never a replacement for them, so an outage degrades the line to its current way of running, not to a stop.
Advisory recommendations start from the plant twin and the control plan in the first weeks. Weld, geometry, paint, torque and end-of-line prediction improve as line history and labelled outcomes accumulate per program. The compute plan sizes onboarding at 150 to 600 GPU-hours per plant and 50,000 to 250,000 synthetic variants per program, all design targets.
Only if you choose cloud training. Designs, control plans, specs, process models and quality records are isolated per tenant and never used to train another OEM's models. On-prem and plant-edge deployment are available for regulated plants, and federated cross-plant learning is planned and waits on data-rights agreements.
You are, the same as with any control strategy, which is why every write is policy-checked, bounded, logged and reversible, and why anything crash-safety or IATF relevant waits for a named approver. The audit log records the request, the evidence, the envelope applied and the human decision.
A paid pilot on one process or area at the Process tier, scoped to a single wedge with a success metric written into the order form: weld or geometry rework, downtime minutes, paint defect or repaint rate, warranty or PPM, or launch quality. Shadow mode first, then assist mode with your engineer approving each move, then bounded autonomy on low-risk loops once ROI and safety gates are met.
Rework per body, repaint rate, downtime minutes, faults escaping to end of line. We will tell you which wedge fits.
↑↓ navigate↵ openesc close